Suppliers Continuous Spirally Wound Welded Fin Tubes With SA210 Gr.A1 Base Tube Material
Details for China Continuous Spirally Wound Welded Fin Tubes With SA210 Gr.A1 Base Tube Material

Continuous Spirally Wound Welded Fin Tubes With SA210 Gr.A1 Base Tube Material

Continuous Spirally Wound Welded Fin Tubes With SA210 Gr.A1 Base Tube Material
Product Type:

Fabric >> Non-woven fabric

Keyword: fin tubes for heat exchangers,steel fin tube
Uses:
Origin:
If you are interested, please contact us!
FOB price: Negotiable
Payment Terms: T/T
Packing: as per export packing standard
Delivery Time: Within 45 days after received your deposits
Detailed Product Description
Specifications:

HFW sprial fin tubes apply in fired heaters , boiler , economizers

Base tube material: SA210 Gr.A1 50.8mmOD X5.5mmTHK X9390mmLG,

Fin Material: CS; FPM158mm X 1.9 mm THK x 12.7 mm H

 

Manufacturing Process:

The fin strip is welded continuously and spirally wound onto a polished bare tube.

And the tube and fins are bonded together by using high frequency resistance welding technique.

 

Description of the inspections carried out

Following documentations should be reviewed & endorsed:

1. Declaration of conformity,

2. Inspection plan,

3. Welding book(WPS & PQR),

4. Finned tubes examination reports

(dimension & visual inspection, hardness test report, tensile test report),

5. Test samples sheet,

6. Incoming inspection report,

7. Inspection certificate for bare tube,

8. Quality test certificate for steel strip,

9. Iinspection & Guarantee certificate for finned tube,

10. Product inspection report.

 

 

Material: Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.

Bare tube OD: 16-219mm Fin Pitch: 3-25mm Fin Height: 5-30mm Fin Thick: 0.8-3mm

 

 

Name

Base tube

(OD) mm

Fin Pitch

(mm)

length

(m)

  Min Max Min Max Min Max
Extruded aluminum fin tube 12.7 51 2.1 10 0.5 20
L/LL/KL aluminum fin tube 19 51 2.1 3.2 0.5 15
Embedded aluminum fin tube 19 42 2.3 3.2 0.5 15
Low fin tube 12.7 32 0.8 2 0.5 20
Spiral fin tube 12.7 70     0.5 20
ERW HF spiral fin tube 16 219 3 25 0.5 28
ERW HF spiral serrated fin tube 16 219 3 25 0.5 28
 

Serrated width(mm)

10 min~26 max

Serrated depth(mm)

4 min~16 max

ERW studded tube 89 200 16 50 2 15
             
DC ERW H/HH fin tube 25 51 9 25 1 15
H/HH fins

Length(mm)

60 min-150 max

Thickness(mm)

1.5 min~4 max

Width(mm)

30 min~50 max

 

 

Application: The High Frequency Resistance Welded Helical Fin Tubes are widely applied in fired heaters, heat exchanger, boilers, economizers, pre-heaters, heat pipes, heaters etc…

 

Capacity: Seven ERW High Frequency fining lines, daily capacity around 50 tons,length≤28meters;

 

Products&Inspection Deatails:

 

 

 

 

 

 

 

 

 

 

 

Sampling

 

 

tensile test

 

 

 

 

Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins

 

 

 

 

 

 

 

FAQ
 

About our company

A------We have three company,

1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)

2. Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)

3. Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)

Besides the companies above mentioned, we don’t have any other name.

 

About Our main business
A------ DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.

 

About Price terms

A------ It could be EXW, FOB,CIF,CNF

 

About Payment Term

A------ We usually accept payment by T/T in advance or by L/C available against draft at sight

 

About Lead Time

A------ Usually it takes about 35-45 days after we received your confirmation.

However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

 

About Quality Control

A----

Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip

Mill test cetification for bare tube

Mill test cetification for fin (alu.tube / alu. strip / steel strip)

Mill test cetification for finned tube

Finned tubes dimension & visual inspection reports

 

 

About Sample

A--- If you are interested in our above products, please contact us.

      We can provide small samples in store for you, and you are welcome to visit our factory

 

Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.

 

 

 

 

 

 

 

 

 

Contact us
Company Name:  
Company Address:  
Zip:  
Contact Person:  
Telephone Number:  
Mobile:  
Fax Number:  
Email:  
Homepage:  
Other products from this supplier